Minnesota contractor increased welding productivity by 20 percent The new plant will be equipped with a computer programmed to shut down the 580-megawatt generators if even slight movement or a minor foundation shift is detected. With operating tolerances down to the millimeter, the turbines must run on a foundation that is completely still and level at all times. The software safeguard will act as a precaution to protect the equipment from potential damage. Adding to that challenge, the High Bridge site lies on the muddy banks of the Mississippi River - the same location as the earlier High Bridge coal plant - allowing the new generators to tie into the electrical grid there. But for centuries, the Mississippi has shifted, eroded and changed course. The new foundation needed to be anchored into the riverbed rock 90 feet underground.
Welding 2,400 12-by-12 inch dimensional H-beams in less than 11 weeks required continuous onsite work. Veit Companies, a Rogers, Minnesota-based specialty contractor hired to install the H-beams, knew that its existing engine-driven welder/generators used on smaller jobs probably could not hold up to the rigorous 12-hour days of heavy-section continuous welding operation. The existing engine-driven welders required intermittent cool-down time. Additionally, they could not be operated for welding while auxiliary power was used for other tasks, such as grinding. There just wasn't enough power to perform simultaneous welding and generator AC auxiliary power tasks. Veit began by researching various options with a local welding equipment distributor, Toll Gas and Welding Supply, headquartered in Blaine, Minnesota with eight locations in the St. Paul area. Veit turned to The Lincoln Electric Company® and its Vantage 400 engine-driven, diesel-powered welder/generators. Veit General Superintendent Pete Jung quickly discovered that not only could the Lincoln® power sources stick weld continuously under their own power without cool-down time, but that the auxiliary power simultaneously supported other power tools. With the new engine-driven welders rated at 100 percent duty cycle, Jung estimates that productivity increased by as much as 20 percent. "I don't think we could have finished the job on schedule and on budget with the old equipment," Jung said. "A lot of manufacturers say their engine-driven welders are 100 percent duty cycle, but when you get down to it, many really aren't. These Lincoln® welders just ran forever without a hitch. The welding distributor, Toll Gas & Welding Supply, also helped us a great deal with many issues."
A second team then ground the end edges of the partially buried beams down to 45-degree bevels to prepare them to be welded to a second 50-foot section. They also beveled the ends of the second beam to be added to the first. While a crane positioned a second 50-foot beam vertically over the first already in the ground, another team tack welded the two beams end to end in a butt weld. Then, a third team finished the job, first by welding three passes on one side of the H-beam joint. Then, the same team arc gouged the joint backside and welded three passes there as well. The backside arc gouging ensured that each joint had 100 percent penetration. Once three passes were made to each side, an additional four passes were made for a total of seven on each side. In all, 42 feet of weld metal was used on each spliced piling using Lincoln Electric® Excalibur® 7018 (AWS E7018) stick electrode in 3/32, 1/8, and 3/16 inch diameter. After the two 50-foot sections were fully joined, the hammer team returned and finished driving the remainder of the now 100-foot piling down into the riverbed. A finishing team later trimmed the tops of the piling to surveyed levels. Because the riverbed rock sloped slightly, each of the pilings differed in overall length. However, before the top half of the pilings were hammered into the ground, every inch of selected welds were ultrasonically tested. The tests checked for slag, porosity and any other imperfections. Any defect discovered was reworked.
Advanced Technology With Chopper Technology, DC current is "chopped" at a very high frequency, providing a fast response and tighter output control of the current. This results in an arc that has easy starts, is smooth and stable, with low spatter and excellent bead appearance. This superior arc performance is similar to an inverter-based power source at a more affordable price. The technology is one of Lincoln's Nextweld® innovations built into many of the company's advanced welding products. "I've never been on a job that demanded such a high level of quality control," Jung said. "But I'm certainly glad we had the new equipment. The arc was always smooth and the machines just performed remarkably well."
Overcoming Obstacles Added to that, all 1,194 pilings were sunk into a plot of land just 90,000 square feet. They were positioned three feet from one another at their centers. To carry out the work, Veit used three cranes, a 950 Caterpillar® loader, nine Lincoln® Vantage® 400 engine-driven welders and a 12,000-pound forklift - all on the muddy riverbank during the late 2006 Minnesota winter. Because of the conditions and the project's tight configuration, the job required close coordination and careful planning. Twenty-four pilings were completed each day in an assembly-line fashion among the various teams composed of two to three men each. Jung added that it was important that the welding machines were able to withstand harsh conditions. And because of the job requirements, the welding power sources were routinely moved from area to area. While one team performed a specific job on one piling, other teams worked on other pilings at different stages, allowing all the workers to rotate throughout the site and eliminate downtime. Had the welding power sources suffered intermittent downtime, the process would have bottlenecked and productivity would be lost, Jung said. Rotating the equipment for additional service more often to replace shutdown welders would have further added to the delays.
Over the 11 week period, the welding teams from Veit laid over 50,000 linear feet of stick weld metal (SMAW) under very tough conditions. With 20 percent productivity gains on a complex job that was completed on time, Jung said he was very pleased with the work accomplished. "I'm not sure what would have happened if we had gone a different route," he said.